Scray Hill Road Project
All the curb and gutter and sidewalk has been placed on Scray Hill Road.   Contractor has some driveways to finish this week.  The terrace areas area being backfilled and topsoil placed.

Northeast Asphalt will be in on Wednesday to grade the street with paving starting the following week (October 19th).

The seeding will be done next spring.  The contractor will be applying a soil stabilizer this fall to reduce erosion over the winter.

Bower Creek Road
The contractor has placed the curb and gutter on the section from CTH G to the north.   Later this week they will install the sidewalk and driveway aprons.